Work that comes out of sprint
TODO list from the sprint
Blueprint information
- Status:
- Complete
- Approver:
- Gema Gomez
- Priority:
- Essential
- Drafter:
- None
- Direction:
- Approved
- Assignee:
- Canonical Platform QA Team
- Definition:
- Approved
- Series goal:
- None
- Implementation:
-
Implemented
- Milestone target:
-
ubuntu-13.08
- Started by
- Gema Gomez
- Completed by
- Gema Gomez
Related branches
Related bugs
Sprints
Whiteboard
phablet-test-run to use utah-client:
phablet-test-run is the tool that developers use to test on the phone (https:/
Work Items
Work items:
[cjohnston] https:/
[doanac] Make utah gather dmesg at the end of the run: DONE
[gema] Work on process on how to make test case base to grow: DONE
[gema] Figure out how to make the mir qa happen in a low impact way for the team: DONE
[fginther] Find out what hw we have for mir testing and what we need to buy: DONE
[fginther] Calibrate testing across the testing process: DONE
[gema] Talk to the team about ubuntu design bugs and how to get design involved: DONE
[gema] Talk to plars and doanac about /var/crash files on the phone (it has been enabled on touch images today): DONE
[gema] Discuss with plars and doanac a way to make the smoke jobs able to run on different devices if one of them is hung: DONE
[gema] Discuss how the lab needs to grow to allow for us to run smoke on different (configurable) devices if one fails and is suspected to be rogue: DONE
[gema] Check about thomi's hw: DONE
[gema] Figure out new name for PS QA (Upstream QA?): DONE
[gema] Figure out if there are crashes happening in passing tests on smoke: DONE
[gema] Figure out if we need to make the dashboard report if a job has had crashes, and use that as a metric to track quality as well (even when the tests pass, something may fail under autopilot): DONE
[doanac] Spec out phablet-test-run to reimplement internals with utah-client: DONE
[gema] Talk to team about renaming smoke to image testing: DONE